LOD explains how detailed, accurate, and build-ready your BIM model is at every stage. As the LOD increases, uncertainty drops—giving you clearer coordination, fewer RFIs, faster approvals, reduced rework, and a smoother, more predictable construction process.
Plumbing Services – LOD 100 → Concept (Early Vision)
Meaning: High-level plumbing intent without system commitment.
Includes: Conceptual zoning for domestic water, sanitary, storm, and fire water systems shown as basic risers, shafts, and service zones aligned with building massing and orientation.
Outcome: Rapid feasibility validation, early utility demand checks, preliminary shaft planning, and confident go/no-go decisions before detailed engineering.
Critical Insight: Early plumbing clarity prevents major space and routing conflicts later.
Plumbing Services – LOD 200 → Early Design (Schematic Design)
Meaning: Organized but flexible plumbing layouts.
Includes: Approximate routing for water supply, drainage, venting, storm systems, preliminary pipe sizing, fixture zone assumptions, and coordination intent with structure and architecture.
Outcome: Clear system intent, realistic early plumbing cost estimates, drainage logic validation, and early stakeholder alignment.
Critical Insight: Most early plumbing coordination risks are resolved here.
Plumbing Services – LOD 300 → Detailed Design (Accurate & Coordinated)
Meaning: Fully defined, coordinated, and constructible plumbing design.
Includes: Accurate pipe sizes, slopes, invert levels, fixture connections, equipment placement, access clearances, and coordinated interfaces with architectural and structural systems.
Outcome: Significant clash reduction, fewer RFIs, smoother authority approvals, and predictable construction documentation.
Critical Insight: This stage prevents the majority of plumbing-related site conflicts.
Plumbing Services – LOD 350/400 → Build-Ready (Fabrication Precision)
Meaning: Fabrication- and installation-ready plumbing detail.
Includes: Pipe supports, hangers, sleeves, embeds, penetration details, slope control, sequencing clarity, spooling readiness, and fabrication tolerances.
Outcome: Faster shop drawing approvals, minimal site rework, controlled installation, accurate prefabrication, and zero guesswork for installers.
Critical Insight: Converts plumbing design into installation-ready certainty.
Plumbing Services – LOD 500 → As-Built (Verified Digital Twin)
Meaning: Final verified model reflecting actual installed plumbing systems.
Includes: Confirmed as-built routing, invert elevations, valve locations, equipment data, field changes, and validated site conditions.
Outcome: Accurate facilities management, reliable future modifications, asset traceability, reduced maintenance risk, and long-term lifecycle value.
Critical Insight: Becomes the owner’s trusted plumbing reference for decades.
This LOD framework ensures complete clarity, predictable coordination, and zero surprises across design, fabrication, and construction — giving every stakeholder the right information at the right time for faster decisions and smoother project delivery.
Increase production bandwidth, eliminate execution bottlenecks, and scale delivery with
confidence
while protecting margins and maintaining performance standards.
Strengthen your delivery infrastructure, increase output capacity, and support larger
project pipelines
without expanding your internal workforce.
© 2025 Bimgraphix Infotech.
All
Rights Reserved.