Margin Assessment

See Where Your Program Is Exposed

The costliest mistakes on complex projects are made on paper. A senior engineer finds where yours is exposed and sends a written summary, with no obligation.

You get your exposure in dollars, ranked by cost, and clear steps to close each gap before it reaches site or shop.

Where it leaks

Where Margin Is Lost

Margin rarely disappears in a single event. It leaks through small gaps that are visible early, if someone looks for them before they reach site or the shop floor.

  • Coordination Gaps

    Conflicts between disciplines that surface on site instead of in the model, turning into RFIs, rework and change orders.

    The costRework and RFIs

  • Incomplete Detailing

    Drawings that reach the shop with open questions stall fabrication and lead to costly remakes of finished assemblies.

    The costCostly remakes

  • Late Design Changes

    Decisions that aren’t carried through to every discipline, leaving models and drawings out of step and schedules slipping.

    The costSchedules slipping

  • Tolerance Failures

    Components that miss specification on the first production run, costing time, scrap and client confidence.

    The costLost time and scrap

Bimgraphix engineers reviewing a structural model
Reviewed by a senior engineer

How it works

How the Assessment Works

Three steps. No obligation. Built around your own figures, not assumptions.

  1. Tell Us About Your Business

    Answer nine short questions about your firm, services and where margin is lost. It takes about two minutes.

  2. A Senior Engineer Reviews It

    A senior engineer, not an automated tool, assesses your answers against 1,500+ projects.

  3. Receive Your Report

    Within one business day, a confidential report shows your margin leakage in dollars and how to recover it. It’s yours to keep.

1,500+Projects supported
350+Engineers
20+Years’ experience
80%Repeat clients

The Most Expensive Mistakes Are Made on Paper. We Make Sure They Stay There.

On billion-dollar programs, one coordination error can cost months. Our confidential assessment shows where your margin is lost.

Request a Margin Assessment

Report within one business day. Confidential.

What you receive

A Clear View of Where Your Margin Is Lost

Every report is prepared by a senior member of our engineering team, not generated automatically, and is built on your own figures.

  • Your Leakage in Dollars

    Estimated yearly and per project, calculated from your revenue, project value and answers.

  • Where It’s Lost

    Your top concerns, ranked by impact, and the stage where they surface.

  • How to Recover It

    Clear, prioritized actions matched to the services you offer, whether or not you work with us.

Your report is confidential and shared only with you.

Sample Margin Assessment report showing estimated leakage, where margin is lost and a recovery plan
Sample report

What clients ask first

Margin Assessment: Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

Have a question about your program?

A senior engineer will review your project and reply within one business day.

Request a Margin Assessment

Or write to info@bimgraphix.com

What is the Margin Assessment?

A confidential review of where your programs lose margin. You answer nine short questions about your firm, services and projects; a senior engineer assesses them against more than 1,500 projects and sends you a written report.

Who is it designed for?

General contractors, architects, structural and MEP engineers, steel fabricators and manufacturers running complex programs, where coordination, detailing or tolerance problems carry real cost.

Do I need to share financial data?

No detailed financials are needed. You choose broad ranges for annual revenue and typical project value, or select “Prefer not to say”. The ranges let us estimate your leakage in dollars.

Is this a sales pitch?

No. The report is yours to keep, and its recommendations stand whether or not you work with us. There is no obligation. If we can help, we will say so; the decision is entirely yours.

What happens after I receive my report?

A senior engineer offers a short call to walk you through the findings and answer your questions. If you want support on any of the recommended actions, we will propose clear next steps.

Have a question about your program?

A senior engineer will review your project and reply within one business day.

Request a Margin Assessment

Or write to info@bimgraphix.com

Start a conversation

Built for Programs Where Precision Is Never Optional.

For over 20 years, one standard has guided every model, drawing and component. Let’s talk about where your programs are losing margin.

  • Response within one business day
  • Reviewed by a senior engineer
  • Confidential