Solve Every Clash Before It Costs Your Margin

Every clash missed in the model becomes rework on site. We run clash detection across trades and track each issue to closure, so schedules hold.

See What Clashes Cost You
  • Every trade checkedArchitecture, structure and MEP.
  • Prioritized clash reportsReal issues, not noise.
  • Clearances verifiedAccess and maintenance zones.
  • Resolved before constructionTracked to closure.
  • 80%Of clients return
  • 20+Years on U.S. programs
  • 1,500+Projects delivered
  • 350+Engineers

Where margin leaks

Field Clashes Cost Your Margin

Every clash missed in the model is found by a crew on site, and paid for in rework, RFIs and margin.

  • Late Trade Clashes

    Where margin leaks
    Ducts, pipes, trays and structure collide on site, forcing rework, RFIs and change orders.
    What we fix
    Federated models checked across every trade, with clashes resolved before construction.
  • Clash Report Overload

    Where margin leaks
    Thousands of raw clashes bury the few that matter, so real issues still reach the field.
    What we fix
    Clashes grouped, prioritized and assigned, so teams fix what matters first.
  • Missing Clearances

    Where margin leaks
    Equipment that fits but cannot be installed or serviced fails inspection and handover.
    What we fix
    Access, clearance and maintenance zones checked as soft clashes, so handover passes.
  • Slow Issue Resolution

    Where margin leaks
    Issues passed around by email stall coordination and push back trade start dates.
    What we fix
    Clear issue reports with views, owners and deadlines, tracked to closure.

How Much Margin Are Missed Clashes Quietly Costing You?

A two-minute Margin Review shows where your programs leak, in dollars, and what clash-free models could save.

Start Your Margin Review

You get the leak in dollars. Two minutes. Confidential.

Gateway International Airport Terminal

What we deliver

Clash Reports Your
Teams Can Act On

  • Federated Model Reviews

    Architecture, structure and MEP combined and checked as one building.

  • Hard and Soft Clash Checks

    Physical collisions, clearances and access zones tested trade by trade.

  • Prioritized Clash Reports

    Grouped, ranked issues with views and locations, not raw clash lists.

  • Issue Tracking to Closure

    Every issue assigned an owner and a deadline, and tracked until resolved.

  • Coordination Meeting Support

    Clear agendas and visuals that keep trade meetings short and decisive.

  • Clash-Free Model Sign-Off

    A coordinated model your trades can fabricate and build from.

  • We work in
  • Navisworks
  • Autodesk Revit
  • Your templates and standards

How it works

From Federated Model to Site

Clashes are found, prioritized and closed before crews mobilize.

  1. 01

    Share Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

    Scope and dates in writing
  2. 02

    Run Clash Detection

    Every trade is federated and checked zone by zone, with clashes assigned to an owner.

    One named lead from day one
  3. 03

    Resolve and Verify

    Issues tracked to closure to NBIMS-US and NEC, with a clear audit trail for every decision made.

    Senior sign-off on every release
  4. 04

    Construction Support

    Re-runs and updates as designs change, so the federated model always stays current.

    Same team through handover

Compliance

Standards and Requirements We Work To

Your standards apply to every model and drawing. Design and sealing stay with your engineer of record.

  • BIMForum LOD Specification

    Model elements developed to the LOD agreed for each stage, up to LOD 400 for fabrication.

  • Your BIM execution plan

    Model structure, naming and exchange dates follow the BEP for each project.

  • ISO 19650 workflows

    Naming, status codes and information exchanges to ISO 19650 where your project requires it.

  • Open BIM (IFC)

    Models exchanged in IFC alongside native Revit files when your partners need open formats.

  • Clash rules and tolerances

    Clash tests run with the rules, tolerances and priorities you set.

  • US National CAD Standard

    Sheets, layers, symbols and notation to the NCS, or to your office CAD standard.

Data security

Your Data Stays Yours

Unreleased designs and controlled data are handled on your terms, from the first file to the final release.

  • NDA from the first file

    We sign your NDA before any drawing, model or scan is shared, and it covers everyone on your project.

  • Need-to-know access

    Only your project team can open your data, and access is removed when the work is complete.

  • Secure transfer

    Files move only through your platform, such as Autodesk Construction Cloud or Procore, or a secure link.

  • Your IP, always

    Every model, drawing and file we produce belongs to you, from the first draft to the final release.

Selected programs

Featured Work

Programs we have supported across construction, fabrication and manufacturing.

View all projects
  • Parkview Corporate Campus: Clash detection across all trades for corporate offices, with issue reports per trade. Commercial

    Parkview Corporate Campus

    OutcomeClashes are fixed in the model, so trades install on site without stopping work.

    Integrated scope Structural BIM Architectural BIM MEP BIM Coordination

    Scale
    650,000 SF
    Service
    Clash Detection
    Client
    Fortune 500 corporate developer
    Location
    Chicago, IL

What clients ask first

Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

  • Answered by senior engineersNot sales, the people who check your sets.
  • Under NDA from the first fileYour drawings stay confidential.
  • One accountable leadA single senior contact for your program.
Ask a senior engineer An engineer replies within one business day.
ScopeWhat does your clash detection include?

Combined architectural, structural and MEP models checked for hard clashes and clearance problems, with prioritized reports, issue tracking and resolution cycles until sign-off.

AccountabilityWhich standards do you follow, and who is responsible for the design?

NBIMS-US and NEC clearances. Design responsibility stays with each discipline's designer of record. Bimgraphix does not stamp or certify models; we answer for every clash being found, reported and tracked to closure.

QualityHow do you make sure critical clashes are fixed first?

Reports are ranked by cost and schedule impact, assigned to the right trade, and tracked to closure in every cycle, so critical issues reach your team first.

CapacityCan you keep pace with a large, fast-moving program?

Yes. The team is sized to your program and work is released in regular cycles by zone, so nothing waits for the full set. Fees are priced per cycle or per program and fixed in the proposal with the schedule and revision rounds. You can start with one coordination cycle to test the fit first.

ChangesWhat happens when the design changes?

Send the revised drawings, sketches or RFI responses. We update the model and every affected sheet, cloud the changes, step the revision and list exactly what changed, so the next issue is checked quickly.

QuotationWhat do you need from us to quote?

A sample of the drawings or models, the scope, your standards or BIM execution plan, and the dates your schedule is working to.

Margin Review

Find Every Clash in the Model. Not on Site, Where It Costs You.

Each clash resolved in coordination is rework, delay and a claim avoided.
2 minutes from you. 1 business day from us.

  • 1,500+ projects delivered
  • ISO 19650 workflows
  • Navisworks · Revit native files
  • NDA before any file