Get Every Quantity Right Before You Bid

A bid built on miscounted quantities risks material overruns and absorbed change orders. We measure and check every item, so you bid with confidence.

See What Quantity Errors Cost You
  • Measured to standardMasterFormat, UniFormat and ASMM.
  • Model-based accuracyDrawings and BIM models.
  • Organized for pricingBy trade, level and zone.
  • Checked before releaseSenior review on every takeoff.
  • 80%Of clients return
  • 20+Years on U.S. programs
  • 1,500+Projects delivered
  • 350+Engineers

Where margin leaks

Quantity Errors Cost Your Margin

Quantities set the bid and the buy. Every miscount becomes a change order you absorb.

  • Underpriced Bids

    Where margin leaks
    Missed items and miscounts win the job and lose the margin before work even starts.
    What we fix
    Every item measured from drawings and models, then checked, so your bids hold up.
  • Spools Rebuilt on Board

    Where margin leaks
    Short or excess orders mean rush freight, wasted material and crews standing idle.
    What we fix
    Quantities by trade, level and zone for accurate buying, so materials arrive on time.
  • Missed Scope

    Where margin leaks
    Items left out of the takeoff surface later as change orders the client will not pay.
    What we fix
    Scope cross-checked against drawings, specs and addenda, so nothing is left out.
  • Slow Bid Turnaround

    Where margin leaks
    Late takeoffs force rushed pricing or missed bid dates, and winnable work is lost.
    What we fix
    Fast, checked takeoffs that keep your estimators ahead of every bid deadline.

How Much Margin Are Quantity Errors Quietly Costing You?

A two-minute Margin Review shows where your estimates leak, in dollars, and what takeoffs counted right the first time could save.

Start Your Margin Review

You get the leak in dollars. Two minutes. Confidential.

Horizon Logistics & Distribution Center

What we deliver

Takeoffs Your Estimators
Can Bid With

  • Quantity Takeoff Reports

    Measured quantities for every trade and item, traceable back to the drawings.

  • Bills of Quantities

    Structured BOQs in your format, ready for pricing, tender and bid comparison.

  • Model-Based Takeoffs

    Quantities extracted directly from BIM models, so counts match the design.

  • Material Schedules

    Concrete, steel, MEP and finishes by level and zone.

  • Cost Estimates

    Priced estimates built on verified quantities, so budgets hold through tender.

  • Change Order Quantities

    Fast re-measures when the design changes, so every change order is backed by numbers.

  • We work in
  • Autodesk Revit
  • Navisworks
  • Bluebeam
  • Your templates and standards

How it works

From Drawings to Bid

Every item is measured and checked before your bid goes out.

  1. 01

    Share Your Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

    Scope and dates in writing
  2. 02

    Measure Every Item

    Quantities by trade, level and zone, taken from your drawings and models for the bid.

    One named lead from day one
  3. 03

    Check and Release

    Senior engineer review to MasterFormat, UniFormat and ASMM before submission.

    Senior sign-off on every release
  4. 04

    Support Through Award

    Fast re-measures for addenda and design changes, so your bid stays current.

    Same team through handover

Compliance

Standards and Requirements We Work To

Your standards apply to every model and drawing. Design and sealing stay with your engineer of record.

  • BIMForum LOD Specification

    Model elements developed to the LOD agreed for each stage, up to LOD 400 for fabrication.

  • Your BIM execution plan

    Model structure, naming and exchange dates follow the BEP for each project.

  • ISO 19650 workflows

    Naming, status codes and information exchanges to ISO 19650 where your project requires it.

  • Open BIM (IFC)

    Models exchanged in IFC alongside native Revit files when your partners need open formats.

  • Clash rules and tolerances

    Clash tests run with the rules, tolerances and priorities you set.

  • US National CAD Standard

    Sheets, layers, symbols and notation to the NCS, or to your office CAD standard.

Data security

Your Data Stays Yours

Unreleased designs and controlled data are handled on your terms, from the first file to the final release.

  • NDA from the first file

    We sign your NDA before any drawing, model or scan is shared, and it covers everyone on your project.

  • Need-to-know access

    Only your project team can open your data, and access is removed when the work is complete.

  • Secure transfer

    Files move only through your platform, such as Autodesk Construction Cloud or Procore, or a secure link.

  • Your IP, always

    Every model, drawing and file we produce belongs to you, from the first draft to the final release.

Selected programs

Featured Work

Programs we have supported across construction, fabrication and manufacturing.

View all projects
  • Gateway International Airport Terminal: Quantity take-off for terminal concourses: structure, finishes and MEP, ready to price. Aviation

    Gateway International Airport Terminal

    OutcomeQuantities come straight from the drawings, so estimates and buying start from real numbers.

    Integrated scope Structural BIM Architectural BIM MEP BIM Coordination

    Scale
    850,000 SF
    Service
    Quantity Take-off
    Client
    International aviation infrastructure developer
    Location
    Atlanta, GA

What clients ask first

Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

  • Answered by senior engineersNot sales, the people who check your sets.
  • Under NDA from the first fileYour drawings stay confidential.
  • One accountable leadA single senior contact for your program.
Ask a senior engineer An engineer replies within one business day.
ScopeWhat does your quantity take-off include?

Measured quantities of every material and item, by trade, level and zone, from drawings and BIM models, in your cost codes and estimating format.

AccountabilityWhich standards do you follow, and who owns the final estimate?

MasterFormat, UniFormat and AACE practice. Bimgraphix does not certify quantities or take estimating liability; your estimator owns the final price. We answer for every quantity tracing back to a drawing, sheet or model element, with assumptions listed so your team can review them.

QualityHow do you make sure quantities are right?

Every take-off is measured against the latest drawings, specifications and addenda, independently checked and senior-reviewed before release.

CapacityCan you keep pace with a large, fast-moving program?

Yes. The team is sized to your program and work is released by trade or package, so nothing waits for the full set. Fees are priced per project or per trade and fixed in the proposal with the schedule and revision rounds. You can start with one trade package to test the fit first.

ChangesWhat happens when the design changes?

Send the revised drawings, sketches or RFI responses. We update the model and every affected sheet, cloud the changes, step the revision and list exactly what changed, so the next issue is checked quickly.

QuotationWhat do you need from us to quote?

A sample of the drawings or models, the scope, your standards or BIM execution plan, and the dates your schedule is working to.

Margin Review

Know Your Numbers Before You Bid. Accurate Quantities Protect Margin.

Precise take-offs tighten bids and prevent costly overruns.
2 minutes from you. 1 business day from us.

  • 1,500+ projects delivered
  • ISO 19650 workflows
  • Revit · Bluebeam native files
  • NDA before any file