Metal staircases

Get Every Stair Right Before Steel Is Cut

A stair built from an unclear drawing risks recut steel, failed inspections and blocked access. We check code-compliant drawings and 3D models before release.

See What Stair Rework Costs You
  • Built to codeIBC, OSHA, NCC and AS 1657.
  • Fabrication-readyEvery stringer, tread and weld.
  • Coordinated with siteSlabs, openings and embeds.
  • Checked before releaseSenior review on every set.
  • 20+Years’ experience
  • 150,000+Tons of steel detailed
  • 350+Engineering professionals
  • 80%Repeat clients

Where margin leaks

Stair Rework Costs Your Margin

A stair is on the critical path for every trade. Each drawing error means a schedule that slips.

  • Field Fit Problems

    Where margin leaks
    Stringers and landings that miss slab edges, openings or embeds clash on site.
    What we fix
    Every stair checked against the building and existing conditions, so it fits first time.
  • Failed Inspections

    Where margin leaks
    Wrong risers, treads, guards or handrails fail egress and fall-protection checks.
    What we fix
    Drawings prepared to IBC, OSHA, the NCC and AS 1657 before submittal, so stairs pass.
  • Connection Errors

    Where margin leaks
    Wrong holes, plates and welds send steel back to the shop and stall erection.
    What we fix
    Every connection, bolt pattern and weld detailed for fabrication, so erection keeps moving.
  • Schedule Delays

    Where margin leaks
    A stair that will not fit holds up access, inspections and every trade behind it.
    What we fix
    Erection drawings that keep installation fast and in sequence for every trade behind it.
Black steel access stair and platform with grating treads and handrails at a building door

What we deliver

Stair Drawings Your
Shop Can Build From

  • Shop Drawings

    Plans, elevations and sections of every stair.

  • Fabrication Drawings

    Stringers, treads and landings detailed piece by piece.

  • Handrails and Guards

    Rails, pickets and guards detailed to code.

  • Connection Details

    Base plates, embeds, bolts and welds set out clearly.

  • 3D Models

    Models for coordination, approval and clash checks.

  • Erection Drawings

    Piece marks and sequence for fast, safe installation.

  • We work in
  • Tekla Structures
  • AutoCAD
  • Autodesk Revit
  • Your templates and standards

How it works

From Design to Erection

Every stair is modeled and checked before steel is cut, so it passes inspection first time.

  1. 01

    Share Your Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

  2. 02

    Model and Detail

    Stringers, treads, landings and rails are detailed with rise, going and connections checked.

  3. 03

    Check and Release

    Senior review to IBC, OSHA, the NCC and AS 1657 before stair drawings are released.

  4. 04

    Support Through Erection

    Fast RFI answers and drawing revisions from fabrication through erection until the stair is in use.

How Much Margin Is Stair Rework Quietly Costing You?

A two-minute Margin Assessment shows where your stair programs leak, in dollars, and what drawings built right the first time could save.

Request a Margin Assessment

Confidential. No commitment.

What clients ask first

Metal Staircases: Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

Ask a senior engineer An engineer replies within one business day.
What do your metal staircase drawings include?

Fabrication and erection drawings for steel stairs: stringers, treads, landings, handrails, guards and connections, with flat patterns, cut lists and bills of material, for egress, exterior, spiral and industrial stairs.

Which codes do you follow, and who is responsible for the design?

IBC egress rules, OSHA 1910 and 1926, AISC and ADA for US projects; the NCC, AS 1657, AS 4100 and AS 1428 for Australian projects. Design responsibility stays with your engineer of record, who reviews and seals the work. Bimgraphix does not stamp drawings; we answer for every sheet matching your design inputs, and any gap is raised as an RFI, never guessed.

How do you make sure stairs fit the building first time?

Floor-to-floor heights, openings and landings are checked against the architectural and structural drawings, and riser, tread and guard geometry against code, before an independent check and senior review.

How are fees and schedules set, and can you handle large programs?

Fees and delivery dates are fixed in a written proposal from your scope, priced per stair or per package, before any work starts. Large programs are released stair by stair or by building core, with the team sized to your schedule. Revision rounds are agreed up front, and anything outside scope is quoted before we do it.

How do you protect our drawings, models and data?

We sign your NDA before any files are shared. Your models and drawings remain your property, exchanged through Autodesk Construction Cloud, Procore or a secure link, and access is limited to the team on your project.

Start a conversation

Built for Programs Where Precision Is Never Optional.

For over 20 years, one standard has guided every model, drawing and component. Let’s talk about where your programs are losing margin.

  • Response within one business day
  • Reviewed by a senior engineer
  • Confidential