Get Every Beam Right Before a Dollar Is Spent

Structure is built first and hardest to change. We model, coordinate and check every member before steel is ordered or concrete poured, so nothing is redone.

See What Structural Changes Cost You
  • Every member checkedSized before anything is built.
  • Coordinated with every tradeSleeves set before the pour.
  • Fabrication-ready detailSteel and rebar from the model.
  • Checked before releaseSenior review on every set.
  • 80%Of clients return
  • 20+Years on U.S. programs
  • 1,500+Projects delivered
  • 350+Engineers

Where margin leaks

Structural Errors Cost Margin

Once structure is poured or erected, each error means demolition, refabrication or delay on site.

  • Late Structural Changes

    Where margin leaks
    A member moved after steel is ordered or concrete poured means rework and lost weeks.
    What we fix
    Every member sized, placed and checked in the model before anything is ordered or poured.
  • Missed Openings

    Where margin leaks
    Openings missed in slabs and beams mean core drilling, engineer reviews and delays.
    What we fix
    Openings and sleeves coordinated with MEP and placed in the model before the pour.
  • Fabrication Mismatches

    Where margin leaks
    Steel and rebar built from inconsistent drawings arrive wrong and stop erection.
    What we fix
    Fabrication-ready models and drawings that match the coordinated structure.
  • Wrong Quantities

    Where margin leaks
    Inaccurate take-offs lead to over-ordering, shortages and disputed costs.
    What we fix
    Material quantities taken straight from the model, accurate and up to date.

How Much Margin Is Structural Rework Quietly Costing You?

A two-minute Margin Review shows where your programs leak, in dollars, and what getting structure right first could save.

Start Your Margin Review

You get the leak in dollars. Two minutes. Confidential.

Summit Convention Center

What we deliver

Structural Models Your Teams Can Build From

  • Structural BIM Models

    Concrete, steel and timber frames, LOD 100 to 500.

  • Multi-Discipline Coordination

    Structure coordinated with architecture and MEP, including openings and sleeves.

  • Structural Construction Drawings

    Plans, sections, framing and details generated from the model.

  • Rebar and Steel Detailing

    Reinforcement and connection detail ready for fabrication.

  • Quantities and Take-offs

    Concrete, steel and rebar quantities that stay in sync.

  • As-Built Models

    A verified record of the built structure, for operations.

  • We work in
  • Autodesk Revit
  • Navisworks
  • Tekla Structures
  • Your templates and standards

Level of development

The More We Detail, the Less You Rework

Commit structure too early or too loosely and the cost shows up as redesign, RFIs and rework on site.

  1. Stage
  2. LOD 100Concept
  3. LOD 200Schematic Design
  4. LOD 300Detailed Design
  5. LOD 350/400Build-Ready
  6. LOD 500As-Built

Cost to change a decision

$

Low

$$

Moderate

$$$

High

$$$$

Very high

$$$$$

Highest

Confidence in the model

Indicative

Approximate

Coordinated

Build-ready

Verified

Decide early, while change is cheap. Build from a model you can trust.

  1. Structural model at LOD 100: simple massing block
    LOD 100

    Concept

    Early Vision

    owners & developers

    Confirm structural feasibility before detailed engineering starts.

    What we model
    Conceptual massing, preliminary grids, core locations and load paths.
    What it protects
    Avoids fundamental redesign later
  2. Structural model at LOD 200: approximate wall and core elements
    LOD 200

    Schematic Design

    Early Design

    architects & structural engineers

    Align structure with architecture and MEP at schematic stage.

    What we model
    Preliminary framing, approximate beam and column sizes, slabs and cores.
    What it protects
    Realistic early cost estimates
  3. Structural model at LOD 300: accurately sized steel members
    LOD 300

    Detailed Design

    Accurate & Coordinated

    Where most margin is protected

    Typical for construction documents

    structural engineers & general contractors

    Issue construction documents that hold up to review and pricing.

    What we model
    Exact sizes and placement of beams, columns, slabs, walls and foundations.
    What it protects
    Fewer RFIs, reliable take-offs
  4. Structural model at LOD 350/400: steel base plates and anchor bolts
    LOD 350/400

    Build-Ready

    Fabrication Precision

    fabricators & general contractors

    Hand fabricators and erectors a model they can build from.

    What we model
    Connections, reinforcement, embeds, anchors, openings, tolerances and sequencing.
    What it protects
    Faster approvals, less site rework
  5. Structural model at LOD 500: as-built column on its foundation
    LOD 500

    As-Built

    Verified Digital Twin

    owners & facility managers

    Renovate and assess the structure from a verified record.

    What we model
    Confirmed geometry, actual member sizes, connection updates and field changes.
    What it protects
    Reliable records for safe renovations

Not sure which LOD your program needs?

A senior engineer will recommend the right LOD for each phase, and what each choice costs, usually within one business day.

Ask an Engineer

How it works

From Design to Fabrication

Every member is modeled and checked before steel or concrete is ordered.

  1. 01

    Share Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

    Scope and dates in writing
  2. 02

    Model, Coordinate

    Members and openings are coordinated with every trade through clash detection.

    One named lead from day one
  3. 03

    Check and Release

    Senior engineer review to AISC 360 and ACI 318 before any release, so nothing goes out unchecked.

    Senior sign-off on every release
  4. 04

    Construction Support

    Fast RFI answers and model updates through installation, so crews avoid field rework.

    Same team through handover

Compliance

Standards and Requirements We Work To

Your standards apply to every model and drawing. Design and sealing stay with your engineer of record.

  • BIMForum LOD Specification

    Model elements developed to the LOD agreed for each stage, up to LOD 400 for fabrication.

  • Your BIM execution plan

    Model structure, naming and exchange dates follow the BEP for each project.

  • ISO 19650 workflows

    Naming, status codes and information exchanges to ISO 19650 where your project requires it.

  • Open BIM (IFC)

    Models exchanged in IFC alongside native Revit files when your partners need open formats.

  • Clash rules and tolerances

    Clash tests run with the rules, tolerances and priorities you set.

  • US National CAD Standard

    Sheets, layers, symbols and notation to the NCS, or to your office CAD standard.

Data security

Your Data Stays Yours

Unreleased designs and controlled data are handled on your terms, from the first file to the final release.

  • NDA from the first file

    We sign your NDA before any drawing, model or scan is shared, and it covers everyone on your project.

  • Need-to-know access

    Only your project team can open your data, and access is removed when the work is complete.

  • Secure transfer

    Files move only through your platform, such as Autodesk Construction Cloud or Procore, or a secure link.

  • Your IP, always

    Every model, drawing and file we produce belongs to you, from the first draft to the final release.

Selected programs

Featured Work

Programs we have supported across construction, fabrication and manufacturing.

View all projects
  • Gateway International Airport Terminal: Structural BIM model for terminal concourses: foundations, framing, slabs and openings. Aviation

    Gateway International Airport Terminal

    OutcomeFraming conflicts are settled in the model, so the structure is built as drawn.

    Integrated scope Architectural BIM MEP BIM Coordination Clash Detection

    Scale
    850,000 SF
    Service
    Structural BIM
    Client
    International aviation infrastructure developer
    Location
    Atlanta, GA

What clients ask first

Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

  • Answered by senior engineersNot sales, the people who check your sets.
  • Under NDA from the first fileYour drawings stay confidential.
  • One accountable leadA single senior contact for your program.
Ask a senior engineer An engineer replies within one business day.
ScopeWhat does your structural BIM include?

3D models of the structural frame in concrete, steel or timber, coordinated with architecture and MEP, with drawings, quantities and as-built models, at LOD 100 to 500.

AccountabilityWhich codes do you follow, and who is responsible for the design?

AISC 360 and ACI 318. Design responsibility stays with your engineer of record, who reviews and seals the work. Bimgraphix does not stamp drawings; we answer for every sheet matching your design inputs, and any gap is raised as an RFI, never guessed.

QualityHow do you make sure the model is right?

Every member is modeled from the engineering design, openings and embeds are coordinated with MEP, and the model is senior-reviewed before release.

ChangesWhat happens when the design changes?

Send the revised drawings, sketches or RFI responses. We update the model and every affected sheet, cloud the changes, step the revision and list exactly what changed, so the next issue is checked quickly.

QuotationWhat do you need from us to quote?

A sample of the drawings or models, the scope, your standards or BIM execution plan, and the dates your schedule is working to.

CommercialsHow are fees and schedules set, and can you handle large programs?

Fees and delivery dates are fixed in a written proposal from your scope, priced per model or per phase, before any work starts. Large programs are released by level or zone, with the team sized to your schedule. Revision rounds are agreed up front, and anything outside scope is quoted before we do it.

Margin Review

Structural Models Every Trade Can Build Around. Coordination That Protects Your Schedule.

Coordinated structural BIM catches conflicts before steel and concrete.
2 minutes from you. 1 business day from us.

  • 1,500+ projects delivered
  • LOD 400 for fabrication
  • Revit · Tekla native files
  • NDA before any file