MEP coordination

Every Trade Aligned Before Crews Mobilize

Every MEP conflict missed in design becomes rework on site. We coordinate all MEP and fire trades in one model and check each zone before release.

See What Trade Conflicts Cost You
  • Every trade coordinatedOne model, every system.
  • Ceiling heights protectedServices fit by design.
  • Access verifiedMaintenance zones checked.
  • Checked before releaseSenior review on every set.
  • 20+Years’ experience
  • 1,500+Projects supported
  • 350+Engineering professionals
  • 80%Repeat clients

Where margin leaks

Trade Conflicts Cost Your Margin

MEP drives most field conflicts. Each clash found on site means rework, RFIs, idle trades and lost days.

  • Trades Fighting for Space

    Where margin leaks
    Ducts, pipes, conduit and sprinklers routed separately collide in the ceiling.
    What we fix
    Every MEP system routed together in one coordinated model, so trades install once.
  • Lost Ceiling Heights

    Where margin leaks
    Uncoordinated services force lower ceilings and late design changes the owner pays for.
    What we fix
    Ceiling zones planned so every service fits and the design heights the owner wanted hold.
  • No Room for Maintenance

    Where margin leaks
    Equipment that fits but cannot be accessed fails handover and costs owners.
    What we fix
    Access and service clearances checked for every piece of equipment.
  • Install Sequence Delays

    Where margin leaks
    Trades that install out of order rip out each other’s work, and the schedule slips.
    What we fix
    Coordinated drawings that set a clear, buildable install sequence for every trade.
Coordinated ductwork, diffusers and fire mains over a large open office floor

What we deliver

MEP Drawings Every
Trade Can Build From

  • Coordinated MEP Models

    Mechanical, electrical, plumbing and fire protection in one model.

  • Combined Services Drawings

    All trades shown together, floor by floor, for review and sign-off.

  • Clash Resolution

    Conflicts found, resolved and tracked before construction.

  • Ceiling and Riser Coordination

    Ceiling zones, risers and shafts planned for every system.

  • Sleeve and Penetration Drawings

    Openings located so trades pass through structure cleanly.

  • Trade Shop Drawings

    Coordinated drawings each trade can install from.

  • We work in
  • Autodesk Revit
  • Navisworks
  • AutoCAD MEP
  • Your templates and standards

How it works

From Design to Install

Every trade is coordinated in one model before crews mobilize.

  1. 01

    Share Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

  2. 02

    Every Trade Aligned

    Mechanical, electrical, plumbing and fire, federated by zone and checked for clashes.

  3. 03

    Check and Release

    Senior review to IMC, IPC, NEC, AS/NZS 3000 and 3500 before models are released.

  4. 04

    Construction Support

    Fast RFI answers and model updates through installation, so crews avoid field rework.

How Much Margin Are Trade Conflicts Quietly Costing You?

A two-minute Margin Assessment shows where your programs leak, in dollars, and what fully coordinated MEP could save.

Request a Margin Assessment

Confidential. No commitment.

What clients ask first

MEP Coordination: Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

Ask a senior engineer An engineer replies within one business day.
What does your MEP coordination include?

Mechanical, electrical, plumbing and fire protection brought together in one model, with clashes resolved, ceiling zones and access planned, and coordinated drawings for every trade.

Which codes do you follow, and who is responsible for the design?

The IMC, IPC and NEC for US projects; AS/NZS 3000 and AS/NZS 3500 for Australian projects. Design responsibility stays with your engineer of record, who reviews and seals the work. Bimgraphix does not stamp drawings; we answer for every sheet matching your design inputs, and any gap is raised as an RFI, never guessed.

How do you make sure trades install without rework?

Coordination runs in cycles with your trades, every issue is tracked to closure, and each zone is signed off before drawings are issued.

How fast can you deliver, and how is it priced?

We quote per floor or per zone and confirm the delivery schedule in writing before work begins, so dates and costs are known on day one. Work is released zone by zone, so your team can start early. You can begin with one floor or zone and judge the quality before committing the full program.

Is our project information kept confidential?

Yes. We work under your NDA from the first file. Everything we produce, including models and drawings, belongs to you, is shared only through Autodesk Construction Cloud, Procore or a secure link, and is seen only by the team assigned to your project.

Start a conversation

Built for Programs Where Precision Is Never Optional.

For over 20 years, one standard has guided every model, drawing and component. Let’s talk about where your programs are losing margin.

  • Response within one business day
  • Reviewed by a senior engineer
  • Confidential