Get Every Tank Right Before Fabrication Begins

A tank built from an unclear drawing risks costly field rework. We produce code-compliant tank shop drawings and check every sheet, so panels fit first time.

See What Tank Rework Costs You
  • Built to codeAPI 650 and AWWA D103.
  • Fabrication-ready panelsEvery plate and bolt hole.
  • Complete material listsReady for purchasing.
  • Checked before releaseSenior review on every set.
  • 80%Of clients return
  • 20+Years on U.S. programs
  • 1,500+Projects delivered
  • 350+Engineers

Where margin leaks

Tank Rework Costs Your Margin

Tank panels are made to order. One wrong nozzle or bolt pattern delays commissioning.

  • Panels That Do Not Fit

    Where margin leaks
    Panels cut or punched from unchecked dimensions arrive misaligned and need field rework.
    What we fix
    Shell, roof and floor layouts checked plate by plate before fabrication, so panels fit.
  • Code Review Rejections

    Where margin leaks
    Drawings that miss API or AWWA requirements come back from review and stall the job.
    What we fix
    Drawings prepared to API 650, AWWA D103 and project specifications.
  • Accessory Clashes

    Where margin leaks
    Ladders, platforms, nozzles and openings clash once the tank is erected.
    What we fix
    Every accessory, nozzle and opening coordinated in one model, so erection runs clean.
  • Seam and Joint Leaks

    Where margin leaks
    Unclear seam, bolt and sealing details lead to leaks and costly repairs.
    What we fix
    Seam, bolt pattern and sealing details set out for erectors, so tanks hold on first fill.

How Much Margin Is Tank Rework Quietly Costing You?

A two-minute Margin Review shows where your programs leak, in dollars, and what tanks built right the first time could save.

Start Your Margin Review

You get the leak in dollars. Two minutes. Confidential.

Large-Scale Storage Tank

What we deliver

Tank Drawings Your
Shop Can Build From

  • General Arrangement Drawings

    Plans, elevations and sections of the complete tank.

  • Shell and Panel Layouts

    Every plate and panel set out with sizes and bolt patterns.

  • Roof and Floor Details

    Roof structure, floor plates and anchorage fully detailed.

  • Nozzles and Openings

    Nozzles, manways and openings located and detailed.

  • Ladders, Platforms and Handrails

    Access structures detailed for safe, code-compliant use.

  • Bills of Material

    Plates, bolts, fittings and accessories listed for purchasing.

  • We work in
  • AutoCAD
  • SolidWorks
  • Your templates and standards

How it works

From Design to Fabrication

Shells, nozzles and supports are detailed and checked before plate is cut.

  1. 01

    Share Your Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

    Scope and dates in writing
  2. 02

    Model and Detail

    Every shell course, nozzle and support is modeled and checked against the design data.

    One named lead from day one
  3. 03

    Check and Release

    Senior review to API 650 and ASME before any fabrication drawing is released.

    Senior sign-off on every release
  4. 04

    Support Through Erection

    Fast RFI answers and drawing revisions from fabrication through erection until the tank is in service.

    Released in erection sequence

Compliance

Standards and Requirements We Work To

Your standards apply to every model and drawing. Design and sealing stay with your engineer of record.

  • AISC 303

    The Code of Standard Practice for shop drawings, approvals, tolerances and erection documents.

  • AWS A2.4 and D1.1

    Standard weld symbols on every drawing, with weld details to the structural welding code.

  • NISD quality practice

    Drawings checked to National Institute of Steel Detailing practice before they leave us.

  • ASTM A6 and material grades

    Shapes, plates, bolts and grades called out to the ASTM standards in your specification.

  • OSHA Subpart R

    Erection drawings show the anchorage and connection data OSHA 1926 Subpart R requires.

  • Model coordination

    The steel model checked against architectural and MEP models before release.

Data security

Your Data Stays Yours

Unreleased designs and controlled data are handled on your terms, from the first file to the final release.

  • NDA from the first file

    We sign your NDA before any drawing, model or scan is shared, and it covers everyone on your project.

  • Need-to-know access

    Only your project team can open your data, and access is removed when the work is complete.

  • Secure transfer

    Files move only through your project platform or an encrypted link, so every exchange is controlled.

  • Your IP, always

    Every model, drawing and file we produce belongs to you, from the first draft to the final release.

Selected programs

Featured Work

Programs we have supported across construction, fabrication and manufacturing.

View all projects
  • Multi-Tank Storage System: Fabrication drawings for three tanks (4.5 ML) with connecting platforms, supports and ladders. Industrial Storage

    Multi-Tank Storage System

    OutcomeThree tanks and their connecting steel aligned first time, protecting commissioning dates.

    Scope Fabrication drawings for three tanks (4.5 ML) with connecting platforms, supports and ladders.

    Scale
    3 tanks, 4.5 ML total capacity
    Service
    Industrial Tanks
    Client
    Global industrial infrastructure developer
    Location
    Darwin, NT
  • Galvanized Steel Tank: Fabrication drawings for a 600,000 gal galvanized tank: panels, ladder and roof platform. Industrial Infrastructure

    Galvanized Steel Tank

    OutcomeTank panels and ladders lined up on the first try, with no site corrections needed.

    Scope Fabrication drawings for a 600,000 gal galvanized tank: panels, ladder and roof platform.

    Scale
    1 tank, 600,000 gal capacity
    Location
    Denver, CO
  • Heavy-Duty Steel Tank: Fabrication drawings for a 500,000 gal tank: shell, external stair, roof platform and nozzles. Industrial Storage

    Heavy-Duty Steel Tank

    OutcomeShell and access platforms fitted on the first lift, with no rework on site.

    Scope Fabrication drawings for a 500,000 gal tank: shell, external stair, roof platform and nozzles.

    Scale
    1 tank, 500,000 gal capacity
    Location
    Houston, TX

What clients ask first

Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

  • Answered by senior engineersNot sales, the people who check your sets.
  • Under NDA from the first fileYour drawings stay confidential.
  • One accountable leadA single senior contact for your program.
Ask a senior engineer An engineer replies within one business day.
ScopeWhat do your industrial tank drawings include?

Fabrication and erection drawings for steel storage tanks: shell and panel layouts, roofs, floors, nozzles, access structures and bills of material.

AccountabilityWhich codes do you follow, and who is responsible for the design?

API 650, AWWA D103 and AISC. Design responsibility stays with your engineer of record, who reviews and seals the work. Bimgraphix does not stamp drawings; we answer for every sheet matching your design inputs, and any gap is raised as an RFI, never guessed.

QualityHow do you make sure plate is right before it is cut?

Plate layouts, nozzle orientations and access structures are checked against the design data sheet and code, and the bill of material against the model, before an independent check and senior review.

ChangesHow do you handle design revisions?

Send the revised design drawings or RFI responses. We update the model, reissue the affected shop and erection drawings and NC files, cloud the changes and list exactly what changed.

QuotationWhat do you need from us to quote?

The design drawings and specification, the scope or tonnage, your shop standards and the erection dates.

CommercialsHow are fees and schedules set, and can you handle large programs?

Fees and delivery dates are fixed in a written proposal from your scope, priced per tank or per package, before any work starts. Large programs are released tank by tank, with the team sized to your schedule. Revision rounds are agreed up front, and anything outside scope is quoted before we do it.

Margin Review

Tanks Detailed for Fabrication and Code. One Error and Everything Stops.

Accurate fabrication drawings keep shop output and inspections on track.
2 minutes from you. 1 business day from us.

  • 1,500+ projects delivered
  • AWS D1.1 welding standard
  • AutoCAD · SolidWorks native files
  • NDA before any file