Metal planters

Get Every Planter Right Before Steel Is Cut

Unclear drawings mean recut steel, failed welds and missed install dates. Our shop-ready drawings and 3D models get planters to fit the site and ship on time.

See What Planter Rework Costs You
  • Built to standardASTM, ADA, AS/NZS 3678 and AS 1428.
  • Fabrication-readyEvery cut, bend and weld.
  • Coordinated with sitePaving, drainage and irrigation.
  • Checked before releaseSenior review on every set.
  • 20+Years’ experience
  • 1,500+Projects supported
  • 350+Engineering professionals
  • 80%Repeat clients

Where margin leaks

Planter Rework Costs Your Margin

Planters go in last, often by the hundred. Every drawing error repeats across the order as rework and delay.

  • Field Fit Problems

    Where margin leaks
    Planters that miss paving, drainage or irrigation points clash on site and are moved.
    What we fix
    Every planter checked against the site plan and ADA or AS 1428 clearances.
  • Recut and Rewelded Steel

    Where margin leaks
    Wrong dimensions, bends or weld details send steel back to the shop at your cost.
    What we fix
    Every cut, bend, seam and weld detailed for fabrication, so planters are built once.
  • Staining and Drainage

    Where margin leaks
    Rust runoff from corten stains new paving and triggers costly claims and repairs.
    What we fix
    Drainage, liners and runoff details resolved in the drawings, so paving stays clean.
  • Repeated Errors at Scale

    Where margin leaks
    One drawing error repeats across every unit in a large order, multiplying the cost.
    What we fix
    Standardized, checked drawings for every size and variant, so errors never repeat.
Cube-shaped dark bronze steel planter with crisp folded edges and flowering plants

What we deliver

Planter Drawings Your
Shop Can Build From

  • Shop Drawings

    Plans, elevations and sections of every planter.

  • Fabrication Drawings

    Cut, bend and weld details for each part.

  • Flat Patterns

    Laser- and brake-ready layouts with bend allowances.

  • 3D Models and Renderings

    Models for design approval and client sign-off.

  • Installation Details

    Drainage, liners, anchoring and paving interfaces.

  • Cut Lists and BOMs

    Material, finish and hardware for every order.

  • We work in
  • SolidWorks
  • AutoCAD
  • Autodesk Inventor
  • Your templates and standards

How it works

From Design to Delivery

Every planter is detailed and checked before steel is cut, so the whole order arrives right.

  1. 01

    Share Your Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

  2. 02

    Model and Detail

    Sizes, bends, seams and drainage are detailed, with flat patterns ready to cut and fold.

  3. 03

    Check and Release

    Senior review to ASTM, ADA, AS/NZS 3678 and AS 1428 before drawings are released.

  4. 04

    Support Through Install

    Fast drawing edits and clear answers for crews on site, so edging goes in once and stays.

How Much Margin Is Planter Rework Quietly Costing You?

A two-minute Margin Assessment shows where your planter programs leak, in dollars, and what drawings built right the first time could save.

Request a Margin Assessment

Confidential. No commitment.

What clients ask first

Metal Planters: Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

Ask a senior engineer An engineer replies within one business day.
What do your metal planter drawings include?

Fabrication drawings and flat patterns for corten, stainless and aluminum planters: dimensions, bends, welds, drainage and finishes, as standard product ranges or project-specific sets.

Which standards do you follow, and who is responsible for the design?

ASTM material standards and ADA clearances for US projects; AS/NZS 3678, AS 1664 and AS 1428 for Australian projects. Design responsibility stays with your engineer of record or the system engineer, who reviews and approves the drawings. Bimgraphix does not stamp drawings; we answer for every sheet matching your inputs, and any gap is raised as an RFI, never guessed.

How do you make sure planters are right before steel is cut?

Flat patterns, bend allowances and weld details are checked against your material and brake tooling, and placement against the site plan and accessible routes, before an independent check and senior review.

How fast can you deliver, and how is it priced?

We quote per size or per range and confirm the delivery schedule in writing before work begins, so dates and costs are known on day one. Work is released size by size across your range, so your team can start early. You can begin with one planter size and judge the quality before committing the full program.

Is our project information kept confidential?

Yes. We work under your NDA from the first file. Everything we produce, including product models and drawings, belongs to you, is shared only through your preferred platform or a secure link, and is seen only by the team assigned to your project.

Start a conversation

Built for Programs Where Precision Is Never Optional.

For over 20 years, one standard has guided every model, drawing and component. Let’s talk about where your programs are losing margin.

  • Response within one business day
  • Reviewed by a senior engineer
  • Confidential