Metal pergolas
Get Every Pergola Right Before Metal Is Cut
Unclear drawings mean recut metal, failed permits and callbacks. Our code-checked shop drawings and 3D models get pergolas up fast and through inspection.
See What Pergola Rework Costs You- Built to codeIBC, ASCE 7, NCC and AS/NZS 1170.
- Fabrication-readyEvery profile, bracket and fastener.
- Coordinated with siteWalls, slabs and drainage.
- Checked before releaseSenior review on every set.
Attached pergolas
Laser-cut privacy screens
Freestanding pergolas
Louvered roof systems
- 20+Years’ experience
- 1,500+Projects supported
- 350+Engineering professionals
- 80%Repeat clients
Where margin leaks
Pergola Rework Costs Your Margin
A pergola goes up on a finished patio, before the owner. Each error means a second trip to site.
Field Fit Problems
- Where margin leaks
- Posts, beams and footings that miss site conditions clash with walls, slabs and drainage.
- What we fix
- Every member checked against the house, slab and site before release, so installs go fast.
Permit and Code Delays
- Where margin leaks
- Drawings that miss wind, snow or setback requirements stall permits and inspections.
- What we fix
- Drawings prepared to IBC, ASCE 7, NCC and AS/NZS 1170 before submittal.
Recut Profiles
- Where margin leaks
- Wrong lengths, holes or louver spacing send aluminum back to the shop.
- What we fix
- Every profile, cut length and fastener detailed for fabrication, so aluminum is cut once.
Callbacks and Warranty
- Where margin leaks
- Leaks, misaligned louvers and loose connections bring crews back at your cost.
- What we fix
- Drainage, louver motion and connections resolved in the model first.

What we deliver
Pergola Drawings Your
Shop Can Build From
Shop Drawings
Plans, elevations and sections of every pergola.
Fabrication Drawings
Posts, beams, louvers and rafters detailed piece by piece.
3D Models and Renderings
Models for design approval, sales and dealer quotes.
Connection Details
Brackets, base plates, fasteners and wall attachments.
Permit Drawings
Footings, loads and anchorage set out for submittal.
Cut Lists and BOMs
Cut lengths, hardware and finishes for every order.
- We work in
- SolidWorks
- AutoCAD
- Autodesk Inventor
- Your templates and standards
- Works with
- Laser-Cut Patterns
- Product Design Modeling
How it works
From Concept to Install
Every pergola is modeled and checked before metal is cut, so it installs in one visit.
- 01
Share Your Documents
Send drawings, models and specs. We confirm scope, deliverables and dates in writing.
- 02
Model and Detail
Frames, louvers, brackets and footings are detailed with connections and fixings.
- 03
Check and Release
Senior review to IBC, ASCE 7, the NCC and AS/NZS 1170 for wind and footing loads.
- 04
Support Through Install
Fast RFI answers and drawing updates until handover, so installers are never left waiting.
How Much Margin Is Pergola Rework Quietly Costing You?
A two-minute Margin Assessment shows where your pergola programs leak, in dollars, and what drawings built right the first time could save.
What clients ask first
Metal Pergolas: Common Questions
Straight answers from our engineering team. If your question isn’t here, ask us directly.
What do your metal pergola drawings include?
Fabrication and installation drawings for aluminum and steel pergolas: posts, beams, louvers, connections, footings and attachments, for single projects or full product ranges.
Which codes do you follow, and who is responsible for the design?
IBC and ASCE 7 for US projects; the NCC, AS/NZS 1170, AS 1664 and AS 4100 for Australian projects. Design responsibility stays with your engineer of record or the system engineer, who reviews and approves the drawings. Bimgraphix does not stamp drawings; we answer for every sheet matching your inputs, and any gap is raised as an RFI, never guessed.
How do you make sure pergolas fit and install fast?
Spans, post positions, footings and wall attachments are checked against the site or house conditions, and every connection is detailed for the installer. Each set is independently checked and senior-reviewed before release.
How are fees and schedules set, and can you handle large programs?
Fees and delivery dates are fixed in a written proposal from your scope, priced per model or per project, before any work starts. Large programs are released model by model across your range, with the team sized to your schedule. Revision rounds are agreed up front, and anything outside scope is quoted before we do it.
How do you protect our drawings, models and data?
We sign your NDA before any files are shared. Your product models and drawings remain your property, exchanged through your preferred platform or a secure link, and access is limited to the team on your project.
Start a conversation
Built for Programs Where Precision Is Never Optional.
For over 20 years, one standard has guided every model, drawing and component. Let’s talk about where your programs are losing margin.
Or write to info@bimgraphix.com
- Response within one business day
- Reviewed by a senior engineer
- Confidential
