• For architects

    Mistakes Made on Paper Stay There.

    Every design error caught in the model is one your client never pays for on site. Drawings go out right, and your margin stays as planned.

    Confidential. Reviewed by a senior engineer.

Before anything is built

Where Programs Are Won or Lost

The same error costs 10× more in the shop and 100× more on site. What decides the outcome is who finds it first.

We find it here

1×

Fixed in the model

A line moved on screen. No material wasted.

Accuracy

Where Accuracy Is Decided

What it costs you

A connection or tolerance missed in the model is only found when parts will not fit.

What we do

Check every connection and tolerance in the model before release, from steel to aerospace parts.

Parts that fit on day one

10×

Fixed in the shop

Parts recut, drawings reissued, slots lost.

Schedule

Where Schedules Slip

What it costs you

Parts recut in the shop lose fabrication slots, and every trade after them waits.

What we do

Work as your extended team, overlapping 75% of your day, so model, drawings and shop stay aligned.

Milestones held

100×

Fixed on site or the line

Rework, idle crews, change orders and lost margin.

Margin

Where Margin Is Lost

What it costs you

A 2% leak from site rework and change orders is $20M a year on a $1B program.

What we do

Put a dollar figure on every gap and close it in the model, before it becomes a change order.

Margin protected, in dollars

Cost multiples: industry rule of thumb (1–10–100 rule of cost of quality).

Catch it at 1×. Never pay for it at 100×.

A senior engineer shows where your errors surface, and what catching them earlier is worth in dollars.

Start Your Margin Review You get the leak in dollars. Two minutes. Confidential.

How We Work

A Process Built for Predictability

A 2% leak costs a $1B firm $20M a year. Five steps close it before site or shop floor, each measured in dollars. See the full process

  1. Uncover · Day 1

    Step 1: Find the Leak

    A senior engineer prices your margin leak within one business day.

    Board-ready report.

  2. Plan · Kickoff

    Step 2: Lock the Scope

    Scope, dates and a named lead, fixed in writing under NDA.

    Fixed price and dates.

  3. Deliver · Ongoing

    Step 3: Model and Detail

    Every clash resolved in your CAD or BIM platform and standards.

    Rework designed out.

  4. Check · Release

    Step 4: Senior Review

    Senior-checked before release, with a record for your audit trail.

    First-pass approval.

  5. Prove · Handover

    Step 5: Measure the Gain

    RFIs, rework and schedule measured against your baseline.

    Savings you can report.

Selected programs

Featured Work

Programs we have supported across construction, fabrication and manufacturing.

View all projects
  • The Meridian Grand Hotel: Architectural BIM model for luxury hotel spaces: walls, openings, roofs and room data. Hospitality

    The Meridian Grand Hotel

    OutcomeDesign conflicts settled in one model before construction planning, not on site.

    Integrated scope Structural BIM MEP BIM Coordination Clash Detection

    Scale
    420 keys
    Service
    Architectural BIM
    Client
    Global luxury hospitality developer
    Location
    San Diego, CA
  • Northpoint Data Center Campus: Mechanical BIM model for critical infrastructure: HVAC plant, ductwork and risers. Data Centers

    Northpoint Data Center Campus

    OutcomeDucts, pipes and plant coordinated with structure, so mechanical installed without rework.

    Integrated scope Structural BIM Architectural BIM MEP BIM Coordination

    Scale
    450,000 SF, 3 buildings
    Location
    Ashburn, VA
  • Aerospace Manufacturing Facility: Shop and erection drawings for 3,200 tons of steel: long-span roof trusses and bracing. Industrial

    Aerospace Manufacturing Facility

    OutcomeThe fabricator had few questions on 3,200 tons of steel, and the facility was delivered on time.

    Scope Shop and erection drawings for 3,200 tons of steel: long-span roof trusses and bracing.

    Scale
    3,200 tons of structural steel
    Location
    Houston, TX

Margin Review

Your Program Margin Is Decided in the Drawings. We Make Sure It Stays Yours.

On a $1B program, every 1% you recover is $10M a year.
2 minutes from you. 1 business day from us.

  • 1,500+ projects delivered
  • 80% of clients return
  • 350+ engineers
  • NDA before any file