Get Every Mezzanine Right Before Steel Is Cut

A mezzanine built from an unclear drawing risks rework and failed inspections. We check every steel member of our code-compliant drawings before release.

See What Mezzanine Rework Costs You
  • Built to codeIBC, OSHA and AISC.
  • Fabrication-ready steelEvery member and bolt.
  • Coordinated with siteRacking, doors and services.
  • Checked before releaseSenior review on every set.
  • 80%Of clients return
  • 20+Years on U.S. programs
  • 150,000+Tons of steel detailed
  • 350+Engineers

Where margin leaks

Mezzanine Rework Costs Your Margin

A mezzanine goes into a working facility. Each drawing error keeps floor space out of use.

  • Field Fit Problems

    Where margin leaks
    Columns, beams and decks that miss site conditions clash with racking, doors and services.
    What we fix
    Every member checked against the building, racking and existing services.
  • Permit and Code Delays

    Where margin leaks
    Drawings that miss IBC or OSHA requirements stall permits and inspections.
    What we fix
    Drawings prepared to IBC, OSHA and AISC requirements before submittal.
  • Connection Errors

    Where margin leaks
    Wrong holes and connections send steel back to the shop and stall erection.
    What we fix
    Every connection, bolt pattern and plate detailed for fabrication, so erection keeps moving.
  • Lost Operating Time

    Where margin leaks
    Every extra day of installation keeps warehouse or plant space out of use and earning.
    What we fix
    Erection drawings that keep installation fast and in sequence, so the space opens sooner.

How Much Margin Is Mezzanine Rework Quietly Costing You?

A two-minute Margin Review shows where your programs leak, in dollars, and what platforms built right the first time could save.

Start Your Margin Review

You get the leak in dollars. Two minutes. Confidential.

Modular Steel Mezzanine

What we deliver

Mezzanine Drawings Your
Shop Can Build From

  • General Arrangement Drawings

    Plans, elevations and sections of the full platform.

  • Steel Fabrication Drawings

    Columns, beams and joists detailed piece by piece.

  • Connection Details

    Bolt patterns, base plates and welds set out clearly.

  • Stairs, Handrails and Gates

    Stairs, guards and gates detailed to OSHA and IBC, so access is safe from day one.

  • Decking and Load Layouts

    Deck type, spans and design loads shown for every bay.

  • Erection Drawings

    Piece marks and sequence for fast, safe installation.

  • We work in
  • Tekla Structures
  • AutoCAD
  • Autodesk Revit
  • Your templates and standards

How it works

From Layout to Erection

Every platform is modeled and checked before steel is cut, so it installs without rework.

  1. 01

    Share Your Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

    Scope and dates in writing
  2. 02

    Model and Coordinate

    Columns, beams and decks are checked against racking, services and clear heights.

    One named lead from day one
  3. 03

    Check and Release

    Senior review to IBC, OSHA and AISC before any erection drawing is released.

    Senior sign-off on every release
  4. 04

    Support Through Erection

    Fast RFI answers and drawing updates from layout through erection, until the floor is in use.

    Released in erection sequence

Compliance

Standards and Requirements We Work To

Your standards apply to every model and drawing. Design and sealing stay with your engineer of record.

  • AISC 303

    The Code of Standard Practice for shop drawings, approvals, tolerances and erection documents.

  • AWS A2.4 and D1.1

    Standard weld symbols on every drawing, with weld details to the structural welding code.

  • NISD quality practice

    Drawings checked to National Institute of Steel Detailing practice before they leave us.

  • ASTM A6 and material grades

    Shapes, plates, bolts and grades called out to the ASTM standards in your specification.

  • OSHA Subpart R

    Erection drawings show the anchorage and connection data OSHA 1926 Subpart R requires.

  • Model coordination

    The steel model checked against architectural and MEP models before release.

Data security

Your Data Stays Yours

Unreleased designs and controlled data are handled on your terms, from the first file to the final release.

  • NDA from the first file

    We sign your NDA before any drawing, model or scan is shared, and it covers everyone on your project.

  • Need-to-know access

    Only your project team can open your data, and access is removed when the work is complete.

  • Secure transfer

    Files move only through your project platform or an encrypted link, so every exchange is controlled.

  • Your IP, always

    Every model, drawing and file we produce belongs to you, from the first draft to the final release.

Selected programs

Featured Work

Programs we have supported across construction, fabrication and manufacturing.

View all projects
  • Custom Steel Access Platform: Structural and fabrication drawings for a 15,000 SF access platform with stairs. Industrial

    Custom Steel Access Platform

    OutcomePurpose-built access at height, installed without shutting down the facility.

    Scope Structural and fabrication drawings for a 15,000 SF access platform with stairs.

    Scale
    15,000 SF platform
    Service
    Mezzanine Platforms
    Client
    Tier-1 industrial construction contractor
    Location
    Perth, WA
  • Industrial Maintenance Platform: Structural and fabrication drawings for an 8,000 SF maintenance platform and stairs. Industrial

    Industrial Maintenance Platform

    OutcomeTechnicians now reach equipment safely, so routine servicing takes less downtime.

    Scope Structural and fabrication drawings for an 8,000 SF maintenance platform and stairs.

    Scale
    8,000 SF platform
    Location
    Phoenix, AZ
  • Trinity Field Aviation Terminal: Shop and erection drawings for 6,800 tons of terminal steel, with erection sequencing. Aviation

    Trinity Field Aviation Terminal

    OutcomeConnections matched across all 6,800 tons of steel, so the terminal stayed on schedule.

    Scope Shop and erection drawings for 6,800 tons of terminal steel, with erection sequencing.

    Scale
    6,800 tons of structural steel
    Location
    Dallas, TX

What clients ask first

Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

  • Answered by senior engineersNot sales, the people who check your sets.
  • Under NDA from the first fileYour drawings stay confidential.
  • One accountable leadA single senior contact for your program.
Ask a senior engineer An engineer replies within one business day.
ScopeWhat do your mezzanine platform drawings include?

Fabrication and erection drawings for steel mezzanines: columns, beams, decking, connections, stairs and handrails, with anchor bolt plans and bills of material.

AccountabilityWhich codes do you follow, and who is responsible for the design?

IBC, OSHA 1910 and AISC. Design responsibility stays with your engineer of record, who reviews and seals the work. Bimgraphix does not stamp drawings; we answer for every sheet matching your design inputs, and any gap is raised as an RFI, never guessed.

QualityHow do you make sure the platform fits the building?

Column positions, clearances and stair access are checked against the building layout, racking and equipment, before an independent check and senior review.

CapacityCan you keep pace with a large, fast-moving program?

Yes. The team is sized to your program and work is released by platform or bay, so nothing waits for the full set. Fees are priced per platform or per package and fixed in the proposal with the schedule and revision rounds. You can start with one platform to test the fit first.

ChangesHow do you handle design revisions?

Send the revised design drawings or RFI responses. We update the model, reissue the affected shop and erection drawings and NC files, cloud the changes and list exactly what changed.

QuotationWhat do you need from us to quote?

The design drawings and specification, the scope or tonnage, your shop standards and the erection dates.

Margin Review

Mezzanines Detailed to Load, Code and Fit. Added Space Without Added Risk.

Accurate steel and connection details speed approval and erection.
2 minutes from you. 1 business day from us.

  • 1,500+ projects delivered
  • AISC 303 code of practice
  • Tekla · AutoCAD native files
  • NDA before any file