Mezzanine platforms
Get Every Mezzanine Right Before Steel Is Cut
A mezzanine built from an unclear drawing risks rework and failed inspections. We check every steel member of our code-compliant drawings before release.
See What Mezzanine Rework Costs You- Built to codeIBC, OSHA, AISC and AS 1657.
- Fabrication-ready steelEvery member and bolt.
- Coordinated with siteRacking, doors and services.
- Checked before releaseSenior review on every set.
Distribution-scale mezzanines
Operating facilities
Braced steel structures
Multi-bay platforms
- 20+Years’ experience
- 150,000+Tons of steel detailed
- 350+Engineering professionals
- 80%Repeat clients
Where margin leaks
Mezzanine Rework Costs Your Margin
A mezzanine goes into a working facility. Each drawing error keeps floor space out of use.
Field Fit Problems
- Where margin leaks
- Columns, beams and decks that miss site conditions clash with racking, doors and services.
- What we fix
- Every member checked against the building, racking and existing services.
Permit and Code Delays
- Where margin leaks
- Drawings that miss IBC, OSHA or Australian Standards stall permits and inspections.
- What we fix
- Drawings prepared to IBC, OSHA, AISC and AS 1657 requirements before submittal.
Connection Errors
- Where margin leaks
- Wrong holes and connections send steel back to the shop and stall erection.
- What we fix
- Every connection, bolt pattern and plate detailed for fabrication, so erection keeps moving.
Lost Operating Time
- Where margin leaks
- Every extra day of installation keeps warehouse or plant space out of use and earning.
- What we fix
- Erection drawings that keep installation fast and in sequence, so the space opens sooner.

What we deliver
Mezzanine Drawings Your
Shop Can Build From
General Arrangement Drawings
Plans, elevations and sections of the full platform.
Steel Fabrication Drawings
Columns, beams and joists detailed piece by piece.
Connection Details
Bolt patterns, base plates and welds set out clearly.
Stairs, Handrails and Gates
Access and fall protection detailed to code.
Decking and Load Layouts
Deck type, spans and design loads shown for every bay.
Erection Drawings
Piece marks and sequence for fast, safe installation.
- We work in
- Tekla Structures
- AutoCAD
- Autodesk Revit
- Your templates and standards
- Works with
- Structural BIM
- Structural Drawings
How it works
From Layout to Erection
Every platform is modeled and checked before steel is cut, so it installs without rework.
- 01
Share Your Documents
Send drawings, models and specs. We confirm scope, deliverables and dates in writing.
- 02
Model and Coordinate
Columns, beams and decks are checked against racking, services and clear heights.
- 03
Check and Release
Senior review to IBC, OSHA, AISC and AS 1657 before any erection drawing is released.
- 04
Support Through Erection
Fast RFI answers and drawing updates from layout through erection, until the floor is in use.
How Much Margin Is Mezzanine Rework Quietly Costing You?
A two-minute Margin Assessment shows where your programs leak, in dollars, and what platforms built right the first time could save.
What clients ask first
Mezzanine Platforms: Common Questions
Straight answers from our engineering team. If your question isn’t here, ask us directly.
What do your mezzanine platform drawings include?
Fabrication and erection drawings for steel mezzanines: columns, beams, decking, connections, stairs and handrails, with anchor bolt plans and bills of material.
Which codes do you follow, and who is responsible for the design?
IBC, OSHA 1910 and AISC for US projects; AS 1657, AS 4100 and AS/NZS 1170 for Australian projects. Design responsibility stays with your engineer of record, who reviews and seals the work. Bimgraphix does not stamp drawings; we answer for every sheet matching your design inputs, and any gap is raised as an RFI, never guessed.
How do you make sure the platform fits the building?
Column positions, clearances and stair access are checked against the building layout, racking and equipment, before an independent check and senior review.
Can you keep pace with a large, fast-moving program?
Yes. The team is sized to your program and work is released by platform or bay, so nothing waits for the full set. Fees are priced per platform or per package and fixed in the proposal with the schedule and revision rounds. You can start with one platform to test the fit first.
Who owns the work, and how is our data handled?
You do. All models and drawings we create for you are your property. We sign your NDA before receiving files, exchange them through Autodesk Construction Cloud, Procore or a secure link, and limit access to your project team.
Start a conversation
Built for Programs Where Precision Is Never Optional.
For over 20 years, one standard has guided every model, drawing and component. Let’s talk about where your programs are losing margin.
Or write to info@bimgraphix.com
- Response within one business day
- Reviewed by a senior engineer
- Confidential
