Mechanical BIM services
Fit Every Duct and Pipe Before You Pay to Install It
Mechanical systems clash more than any trade, and each site clash means cut ducts and idle crews. We coordinate it in the model, so crews install once.
See What Field Rework Costs You- Clash-free before installCoordinated with every trade.
- Fabrication-ready modelsDuct and pipe from the model.
- Every system fitsRouting planned in 3D.
- Checked before releaseSenior review on every set.
Exposed HVAC distribution
HVAC coordination
Equipment and fire protection
Fabricated ductwork
- 20+Years’ experience
- 1,500+Projects supported
- 350+Engineering professionals
- 80%Repeat clients
Where margin leaks
Most Field Rework Starts in the Ceiling
Ducts and pipes compete with structure for space. On site, each conflict means rework and change orders.
Field Clashes
- Where margin leaks
- Ducts and pipes hit beams, sprinklers and electrical, so crews cut, reroute and wait.
- What we fix
- Mechanical models coordinated with every trade, with clashes cleared before installation.
Fabrication Errors
- Where margin leaks
- Duct and pipe sections built from uncoordinated drawings arrive wrong and are made again.
- What we fix
- Fabrication-ready models and spool drawings that match the coordinated design.
Lost Ceiling Space
- Where margin leaks
- Systems that do not fit force lower ceilings, redesign or costly layout changes.
- What we fix
- Routing and elevations planned in 3D, so every system fits the space allowed.
Equipment Access Issues
- Where margin leaks
- Units installed without service clearance mean rework now and higher costs for the owner later.
- What we fix
- Equipment placed with access and maintenance zones checked in the model.

What we deliver
Mechanical Models Your Crews Can Install From
Mechanical BIM Models
HVAC, ductwork, piping and equipment, LOD 100 to 500.
Clash Detection and Coordination
Mechanical coordinated with structure, plumbing, fire protection and electrical.
Shop and Fabrication Drawings
Duct and pipe drawings and spools built from the model.
Construction Drawings
Plans, sections and details generated from the coordinated model.
Quantities and Take-offs
Duct, pipe and equipment quantities that stay in sync.
As-Built Models
A verified record of installed systems, for operations.
- We work in
- Autodesk Revit
- Navisworks
- AutoCAD MEP
- Your templates and standards
- Works with
- MEP BIM
- Structural BIM
- Mechanical Shop Drawings
Level of development
More Detail Now, Less Rework Later
At the wrong level of detail, HVAC problems surface on site, where every fix costs time and margin.
- Stage
- LOD 100Concept
- LOD 200Schematic Design
- LOD 300Detailed Design
- LOD 350/400Build-Ready
- LOD 500As-Built
Cost to change a decision
Low
Moderate
High
Very high
Highest
Confidence in the model
Indicative
Approximate
Coordinated
Build-ready
Verified
Decide early, while change is cheap. Build from a model you can trust.

LOD 100 Concept
Early Visionowners & developers
Confirm HVAC feasibility before you commit to a design.

LOD 200 Schematic Design
Early Designarchitects & MEP engineers
Set a clear HVAC direction with realistic early cost estimates.

LOD 300 Detailed Design
Accurate & CoordinatedWhere most margin is protected
Typical for coordination
MEP engineers & general contractors
Coordinate ductwork and equipment before conflicts reach the site.

LOD 350/400 Build-Ready
Fabrication Precisionmechanical contractors & fabricators
Fabricate and install ductwork with field-ready certainty.

LOD 500 As-Built
Verified Digital Twinowners & facility managers
Operate and renovate on a verified record of installed HVAC.
Not sure which LOD your program needs?
A senior engineer will tell you, and what each choice costs, in your Margin Assessment.
How it works
From Design to Installation
Ducts, pipes and equipment are coordinated before crews install.
- 01
Share Your Documents
Send drawings, models and specs. We confirm scope, deliverables and dates in writing.
- 02
Model and Coordinate
HVAC and piping are routed with structure and every trade, with clash detection by zone.
- 03
Check and Release
Senior review to ASHRAE, SMACNA, IMC, AS 1668 and AS 4254 before models are released.
- 04
Support Through Install
Fast RFI answers and model updates through installation, so crews avoid field rework.
How Much Margin Is Mechanical Rework Quietly Costing You?
A two-minute Margin Assessment shows where your programs leak, in dollars, and what installing once could save.
What clients ask first
Mechanical BIM: Common Questions
Straight answers from our engineering team. If your question isn’t here, ask us directly.
What does your mechanical BIM include?
3D models of HVAC ductwork, piping and equipment coordinated with every trade, with clash detection, shop drawings and as-built models, at LOD 100 to 500.
Which codes do you follow, and who is responsible for the design?
ASHRAE, SMACNA and the IMC for US projects; AS 1668 and AS 4254 for Australian projects. Design responsibility stays with your engineer of record, who reviews and seals the work. Bimgraphix does not stamp drawings; we answer for every sheet matching your design inputs, and any gap is raised as an RFI, never guessed.
How do you make sure the model is right?
The model is coordinated with structure, plumbing, fire and electrical in Navisworks, clashes are resolved with your team, and it is senior-reviewed before release.
How fast can you deliver, and how is it priced?
We quote per model or per floor and confirm the delivery schedule in writing before work begins, so dates and costs are known on day one. Work is released floor by floor or by zone, so your team can start early. You can begin with one floor and judge the quality before committing the full program.
Is our project information kept confidential?
Yes. We work under your NDA from the first file. Everything we produce, including models and drawings, belongs to you, is shared only through Autodesk Construction Cloud, Procore or a secure link, and is seen only by the team assigned to your project.
Start a conversation
Built for Programs Where Precision Is Never Optional.
For over 20 years, one standard has guided every model, drawing and component. Let’s talk about where your programs are losing margin.
Or write to info@bimgraphix.com
- Response within one business day
- Reviewed by a senior engineer
- Confidential