Get Every Opening Right Before You Pour

Every opening missed in a slab or wall means coring, chipping and delay. We check every builder's work drawing before release, so services pass through.

See What Missed Openings Cost You
  • Every penetration locatedSleeves, openings and blockouts.
  • Coordinated with MEPEvery trade checked.
  • Structure-checked openingsClear of beams and rebar.
  • Checked before releaseSenior review on every set.
  • 80%Of clients return
  • 20+Years on U.S. programs
  • 1,500+Projects delivered
  • 350+Engineers

Where margin leaks

Missed Openings Cost Your Margin

One missed or misplaced opening means coring, structural re-review and trades waiting on site.

  • Coring After the Pour

    Where margin leaks
    Openings missed before the pour mean coring, chipping and engineering re-reviews.
    What we fix
    Every sleeve, opening and blockout located before the pour, so nothing is cored later.
  • Structural Conflicts

    Where margin leaks
    Openings placed through beams, rebar or post-tension tendons put the structure at risk.
    What we fix
    Openings checked against beams, rebar and tendons before release, so the frame stays safe.
  • Firestopping Failures

    Where margin leaks
    Penetrations through rated walls and floors without proper details fail inspection.
    What we fix
    Fire-rated penetrations identified and detailed for compliant firestopping.
  • Stalled MEP Installation

    Where margin leaks
    Services that cannot pass through walls and slabs stall every trade behind them.
    What we fix
    Openings sized and coordinated so MEP installs on schedule, with no waiting on trades.

How Much Margin Are Missed Openings Quietly Costing You?

A two-minute Margin Review shows where your programs leak, in dollars, and what openings placed right the first time could save.

Start Your Margin Review

You get the leak in dollars. Two minutes. Confidential.

Westbridge Medical Center

What we deliver

Opening Drawings Your
Crews Can Build From

  • Slab Opening Layouts

    Every slab opening, sleeve and blockout located and sized.

  • Wall Penetration Drawings

    Penetrations through walls and cores set out floor by floor.

  • Sleeve and Embed Schedules

    Every sleeve and embed listed with size, type and location.

  • Structural Coordination

    Openings checked against beams, rebar and post-tension tendons.

  • Fire-Rated Penetration Details

    Rated walls and floors marked for compliant firestopping.

  • Coordinated MEP Overlays

    Ducts, pipes and trays aligned with every opening.

  • We work in
  • Autodesk Revit
  • Navisworks
  • AutoCAD
  • Your templates and standards

How it works

From MEP Model to Pour

Every opening is located before the pour, so nothing is cored or chipped later.

  1. 01

    Share Your Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

    Scope and dates in writing
  2. 02

    Coordinate Openings

    Sleeves and blockouts checked against MEP, beams and rebar before every pour.

    One named lead from day one
  3. 03

    Check and Release

    Senior review to ACI 318 and IBC before drawings are released, so every opening is right on site.

    Senior sign-off on every release
  4. 04

    Support Through the Pour

    Fast answers to site questions before every pour, so crews never wait on clarification.

    Same team through handover

Compliance

Standards and Requirements We Work To

Your standards apply to every model and drawing. Design and sealing stay with your engineer of record.

  • BIMForum LOD Specification

    Model elements developed to the LOD agreed for each stage, up to LOD 400 for fabrication.

  • Your BIM execution plan

    Model structure, naming and exchange dates follow the BEP for each project.

  • ISO 19650 workflows

    Naming, status codes and information exchanges to ISO 19650 where your project requires it.

  • Open BIM (IFC)

    Models exchanged in IFC alongside native Revit files when your partners need open formats.

  • Clash rules and tolerances

    Clash tests run with the rules, tolerances and priorities you set.

  • US National CAD Standard

    Sheets, layers, symbols and notation to the NCS, or to your office CAD standard.

Data security

Your Data Stays Yours

Unreleased designs and controlled data are handled on your terms, from the first file to the final release.

  • NDA from the first file

    We sign your NDA before any drawing, model or scan is shared, and it covers everyone on your project.

  • Need-to-know access

    Only your project team can open your data, and access is removed when the work is complete.

  • Secure transfer

    Files move only through your platform, such as Autodesk Construction Cloud or Procore, or a secure link.

  • Your IP, always

    Every model, drawing and file we produce belongs to you, from the first draft to the final release.

Selected programs

Featured Work

Programs we have supported across construction, fabrication and manufacturing.

View all projects
  • Northpoint Data Center Campus: Builder’s work drawings for critical infrastructure: every opening, sleeve and embed located. Data Centers

    Northpoint Data Center Campus

    OutcomeEvery opening and sleeve is drawn before the pour, so nothing is cored afterwards.

    Integrated scope Structural BIM Architectural BIM MEP BIM Coordination

    Scale
    450,000 SF, 3 buildings
    Service
    Builder’s Work Drawings
    Client
    Global data center developer
    Location
    Ashburn, VA

What clients ask first

Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

  • Answered by senior engineersNot sales, the people who check your sets.
  • Under NDA from the first fileYour drawings stay confidential.
  • One accountable leadA single senior contact for your program.
Ask a senior engineer An engineer replies within one business day.
ScopeWhat do your builder's work drawings include?

Drawings that locate every opening, sleeve, blockout and penetration that MEP services need through slabs, walls and structure, so they are formed before concrete is placed.

AccountabilityWhich codes do you follow, and who is responsible for the design?

ACI 318 and IBC. Design responsibility stays with your engineer of record, who reviews and seals the work. Bimgraphix does not stamp drawings; we answer for every sheet matching your design inputs, and any gap is raised as an RFI, never guessed.

QualityHow do you make sure openings don't clash with structure?

Every opening is checked against beams, rebar and post-tension tendons, and issued for your engineer's review before the pour, so nothing is cored later.

CapacityCan you keep pace with a large, fast-moving program?

Yes. The team is sized to your program and work is released floor by floor, so nothing waits for the full set. Fees are priced per floor or per package and fixed in the proposal with the schedule and revision rounds. You can start with one floor to test the fit first.

ChangesWhat happens when the design changes?

Send the revised drawings, sketches or RFI responses. We update the model and every affected sheet, cloud the changes, step the revision and list exactly what changed, so the next issue is checked quickly.

QuotationWhat do you need from us to quote?

A sample of the drawings or models, the scope, your standards or BIM execution plan, and the dates your schedule is working to.

Margin Review

Every Opening Planned Before the Pour. Less Coring and Patching After the Fact.

Coordinated builder’s work drawings prevent costly rework in finished structure.
2 minutes from you. 1 business day from us.

  • 1,500+ projects delivered
  • LOD 400 for fabrication
  • Revit · Navisworks native files
  • NDA before any file