Catch Every Design Error Before It Hits the Site

A missing detail, late change or unseen conflict is paid for on site. We resolve them in the model first, so you build from correct drawings and keep margin.

See What Design Errors Cost You
  • 600+ architectural projects20+ years of BIM and CAD work.
  • Coordinated before constructionChecked against structure and MEP.
  • One model, every drawingChanges update every sheet at once.
  • Checked before releaseSenior review on every model and set.
  • 80%Of clients return
  • 20+Years on U.S. programs
  • 1,500+Projects delivered
  • 350+Engineers

Where margin leaks

Design Errors Cost Your Margin

Architectural errors rarely stay small. Each one below becomes rework, delay or a change order on site.

  • Design Intent Gaps

    Where margin leaks
    Details left open in design are decided on site, by whoever is there, at whatever it costs.
    What we fix
    Every dimension, assembly and interface defined in the model before documents are issued.
  • Coordination Conflicts

    Where margin leaks
    Architecture clashes with structure or MEP, and crews stop while RFIs travel back and forth.
    What we fix
    Architecture coordinated with structure and MEP, with clashes cleared before site.
  • Late Design Changes

    Where margin leaks
    A change made in one drawing is missed in another, and the error is built at your cost.
    What we fix
    One model drives every plan, section and schedule, so each change updates everywhere.
  • Drawing Errors

    Where margin leaks
    Inconsistent sheets lead to wrong quantities, wrong orders and rejected submittals.
    What we fix
    Construction documents produced from the model and checked before release.

How Much Are Design Errors Quietly Costing Your Programs?

A two-minute Margin Review shows what design errors cost your programs today, in dollars, and how much you can win back.

Start Your Margin Review

You get the leak in dollars. Two minutes. Confidential.

Evergreen Regional Medical Center

What we deliver

Models and Drawings Your Teams Can Build From

  • Architectural BIM Models

    From massing to construction-ready, LOD 100 to 500.

  • Construction Documents

    Plans, sections, elevations and details generated from the model.

  • Multi-Discipline Coordination

    Architectural models coordinated with structure and MEP, with clash detection.

  • Schedules and Quantities

    Door, window, finish and material schedules that stay in sync.

  • As-Built BIM Models

    A verified record of what was built, for operations and future work.

  • Design Visualization

    Renderings and walkthroughs for approvals and stakeholder decisions.

  • We work in
  • Autodesk Revit
  • Navisworks
  • AutoCAD
  • Your templates and standards

Level of development

The Right Detail at Every Stage

Under-model and gaps return as RFIs and change orders. Over-model and you pay for detail nobody uses.

  1. Stage
  2. LOD 100Concept
  3. LOD 200Schematic Design
  4. LOD 300Detailed Design
  5. LOD 350/400Build-Ready
  6. LOD 500As-Built

Cost to change a decision

$

Low

$$

Moderate

$$$

High

$$$$

Very high

$$$$$

Highest

Confidence in the model

Indicative

Approximate

Coordinated

Build-ready

Verified

Decide early, while change is cheap. Build from a model you can trust.

  1. Architectural model at LOD 100: massing only
    LOD 100

    Concept

    Early Vision

    owners & developers

    Make a go / no-go call on the site before design fees are committed.

    What we model
    Massing, height, orientation and the zoning envelope.
    What it protects
    Protects your feasibility budget
  2. Architectural model at LOD 200: walls, roofs and openings in grey
    LOD 200

    Schematic Design

    Early Design

    owners & architects

    Lock layouts, cores and areas while a change still costs hours, not weeks.

    What we model
    Preliminary walls, floors, openings, cores and circulation.
    What it protects
    Protects design fees and the early cost plan
  3. Architectural model at LOD 300: accurate geometry and materials
    LOD 300

    Detailed Design

    Accurate & Coordinated

    Where most margin is protected

    Typical for construction documents

    architects & general contractors

    Issue documents contractors can price and build without guessing.

    What we model
    Accurate dimensions, wall assemblies and levels, coordinated with structure and MEP.
    What it protects
    Fewer RFIs, more accurate bids
  4. Architectural model at LOD 350/400: build-ready detail with finishes
    LOD 350/400

    Build-Ready

    Construction Precision

    general contractors & trade partners

    Approve submittals faster and fabricate once, with every interface resolved.

    What we model
    Assemblies, junctions, tolerances, penetrations and install sequence.
    What it protects
    Fewer change orders, less field rework
  5. Architectural model at LOD 500: as-built record with site and landscape
    LOD 500

    As-Built

    Verified Digital Twin

    owners & facility teams

    Hand over a verified record you can run the building on for decades.

    What we model
    As-built dimensions, confirmed layouts, field changes and finishes.
    What it protects
    Lower operating and renovation cost

Not sure which LOD your program needs?

A senior engineer will recommend the right LOD for each phase, and what each choice costs, usually within one business day.

Ask an Engineer

How it works

From Design Intent to Site

Design errors are resolved in the model, so documents are right before contractors price and build.

  1. 01

    Share Your Documents

    Send drawings, models and specs. We confirm scope, deliverables and dates in writing.

    Scope and dates in writing
  2. 02

    Model and Coordinate

    Architecture modeled and checked against structure and MEP before drawings are issued.

    One named lead from day one
  3. 03

    Check and Release

    Senior review to IBC and ADA, so access and egress hold up at approval.

    Senior sign-off on every release
  4. 04

    Support Through Delivery

    Fast revisions and RFI support through construction, with model and sheets kept current.

    Same team through handover

Compliance

Standards and Requirements We Work To

Your standards apply to every model and drawing. Design and sealing stay with your engineer of record.

  • BIMForum LOD Specification

    Model elements developed to the LOD agreed for each stage, up to LOD 400 for fabrication.

  • Your BIM execution plan

    Model structure, naming and exchange dates follow the BEP for each project.

  • ISO 19650 workflows

    Naming, status codes and information exchanges to ISO 19650 where your project requires it.

  • Open BIM (IFC)

    Models exchanged in IFC alongside native Revit files when your partners need open formats.

  • Clash rules and tolerances

    Clash tests run with the rules, tolerances and priorities you set.

  • US National CAD Standard

    Sheets, layers, symbols and notation to the NCS, or to your office CAD standard.

Data security

Your Data Stays Yours

Unreleased designs and controlled data are handled on your terms, from the first file to the final release.

  • NDA from the first file

    We sign your NDA before any drawing, model or scan is shared, and it covers everyone on your project.

  • Need-to-know access

    Only your project team can open your data, and access is removed when the work is complete.

  • Secure transfer

    Files move only through your platform, such as Autodesk Construction Cloud or Procore, or a secure link.

  • Your IP, always

    Every model, drawing and file we produce belongs to you, from the first draft to the final release.

Selected programs

Featured Work

Architectural BIM delivered for developers, contractors and design firms across the US.

View all Architectural BIM projects
  • Pinnacle Corporate Offices: Architectural BIM covering walls, floors, roofs, openings, room data and interdisciplinary model interfaces for office interiors. Commercial

    Pinnacle Corporate Offices

    OutcomeDesign conflicts settled in one model before construction planning, not on site.

    Integrated scope Structural BIM MEP BIM Coordination Clash Detection

    Scale
    120,000 SF
    Service
    Architectural BIM
    Client
    National commercial property developer
    Location
    Denver, CO

What clients ask first

Common Questions

Straight answers from our engineering team. If your question isn’t here, ask us directly.

  • Answered by senior engineersNot sales, the people who check your sets.
  • Under NDA from the first fileYour drawings stay confidential.
  • One accountable leadA single senior contact for your program.
Ask a senior engineer An engineer replies within one business day.
ScopeWhat does your architectural BIM include?

A coordinated Revit model from massing to construction-ready detail, with plans, sections, elevations and schedules generated from it, at LOD 100 to 500.

AccountabilityWhich codes do you follow, and who is responsible for the design?

IBC and ADA. Design responsibility stays with your architect or engineer of record, who reviews and seals the set. Bimgraphix does not stamp drawings; we answer for every sheet matching your design inputs, and any gap is raised as an RFI, never guessed.

QualityHow do you make sure the model is right?

Models are coordinated with structure and MEP, checked against your drawings and standards, and senior-reviewed before release.

CapacityCan you keep pace with a large, fast-moving program?

Yes. The team is sized to your program and work is released by building, level or phase, so nothing waits for the full set. Fees are priced per model or per phase and fixed in the proposal with the schedule and revision rounds. You can start with one building or level to test the fit first.

ChangesWhat happens when the design changes?

Send the revised drawings, sketches or RFI responses. We update the model and every affected sheet, cloud the changes, step the revision and list exactly what changed, so the next issue is checked quickly.

QuotationWhat do you need from us to quote?

A sample of the drawings or models, the scope, your standards or BIM execution plan, and the dates your schedule is working to.

Margin Review

Architectural Models Every Trade Can Trust. Coordination That Protects Your Fee.

Clean, coordinated BIM cuts RFIs and late redesign.
2 minutes from you. 1 business day from us.

  • 1,500+ projects delivered
  • LOD 400 for fabrication
  • Revit · Navisworks native files
  • NDA before any file